New office space with a sizde of 59m2 on Vodno.
The space is located on the ground floor and consists of one open space, with a possibility to be divided into two separate spaces.
High quality construction materials are used in the construction of the building.
State-of-the-art cooling and heating system with thermal heat pumps.
The building will have smart systems.
The building is expected to be finished March 2025.